Kizilay Winter Tent: Winter Tent Final Design

The original 16m2 Kizilay tent was developed by Kizilay (Turkish Red Crescent). Its tent factory produces reinforced tents and other shelter products, such as rub-halls of various sizes. The National Society has distributed 6,068 tarpaulins aiming to provide tents better insulation during the winter season. Also, the total number of tents distributed is 65.602 and the total number of tarpaulins distributed in camps is 25.956. By early November 2013, with international support, the NS has distributed some 33,240 tents (including replacements for damaged ones that are not double-counted): these tents have been designed to endure harsh winter and weather conditions in camps.

The IFRC-SRU on behalf of LRC-AI shall deliver technical consultancy services to TRC in order to jointly design a winter tent solution to be used in the Syrian crisis response, based on the winterization solution already in use in TRC tents. Special attention was dedicated to improving thermal comfort, as thermal comfort is one of the principal factors for beneficiary satisfaction and also has effects on beneficiary health. Furthermore conduct technical testing of the tent, to establish technical performance criteria.

This program aims to improve the thermal behavior of light shelters distributed therefore provide a better quality of life while significantly reducing fuel consumption per heating putting these tents.

This report presents the final choices and descriptions of the composition of the 16m2 winter tent from Kizilay. This proposed winter tent is a feasible and fast emergency shelter, adapted to moderate winter climates.

To know more about this project, please read the following document: Kizilay Winter Tent: Winter Tent Final Design

Are you sure you want to delete this "resource"?
This item will be deleted immediately. You cannot undo this action.

Related Resources

Guidance material
16 Nov 2018
Preparedness for Effective Response (PER) is a cyclical approach for a National Society (NS) to systematically assess, measure, and analyse the strengths and weaknesses of its response system in order to take remedial actions. The PER approach puts t...
Tags: Guidance material, Capacity Building for Disaster Risk Management, Community Risk Assessment
Research
02 Jan 2023
This research is carried out by Niti Mishra1, Peehu Pardeshi2, Shivani Kaim1, Dipali Bar1, Bateswar Das1, Saurabhi Niroula1, Poulami Ganguli1, Muskaan Ahmed1.  with funding support from the Global Disaster Preparedness Center. Recently, the year 20...
Tags: Research, Hazard, Heat Wave
Report
04 Oct 2019
This presentation was given by Myriam Urzúa Venegas on 17 October, 2019, at the CAP Implementation Workshop in Mexico City, Mexico.
Tags: Report, Early Warning Systems
Scroll to Top