Building Resilient Infrastructure

                                                  

This report reviews the decision-making process for new infrastructure and emphasizes the need to embed resilience into this process and practical guidance to do so. It is based on findings that show critical infrastructure is highly vulnerable to, and a major casualty of, natural disasters. Repairing or replacing infrastructure after a natural disaster is often costly and difficult, and can worsen the suffering of affected communities.

The report makes three key recommendations:

– Improve infrastructure planning processes: integrate resilience in government and industry decision-making by adopting the principles for resilience in infrastructure planning;

– Improve incentives: prioritize policy changes and funding arrangements that ensure disaster resilience is considered and incorporated, where appropriate, into infrastructure planning;

– Improve capacity: government and industry should work to strengthen the technical capacity of practitioners to identify, analyze and evaluate the costs and benefits of resilience options.

Australian Business Roundtable for Disaster Resilience & Safer Communities and Deloitte Access Economics, March 2016 

Online Report
http://australianbusinessroundtable.com.au/assets/documents/Report%20-%20Building%20Resilient%20Infrastructure/Report%20-%20Building%20resilient%20infrastructure.pdf

Are you sure you want to delete this "resource"?
This item will be deleted immediately. You cannot undo this action.
File Name File Size Download
building_resilient_infrastructure.pdf 3 MB

Related Resources

Research
07 Mar 2016
This research aims to build a concept of disaster resilient communities in Palembang, Indonesia based on their current preparedness. In order to achieve this, the level of community structural and non-structural mitigation in Palembang needs to be as...
Tags: Research, Resilience and Disaster Risk Management
Case Study
02 Jan 2019
Led by the Bangladesh Red Crescent Society and supported by the German Red Cross, the Bangladesh FbF project is at the forefront of experience with FbF activation and funding delivery in the Asia-Pacific region.  This case study examines the effecti...
Tags: Case Study, Early Warning Systems, Flood, Hurricane / Typhoon / Cyclone, Resilience and Disaster Risk Management
Report
17 Sep 2015
A Presentation at the 2015 CAP Implementation Workshop (Rome, Italy 23-24 September)
Tags: Report, Early Warning Systems
Scroll to Top